The Virtual Link That Only Lives on Network A

An AFDX virtual link can be declared redundant in the end system and still be missing from one switch's forwarding table. When that happens there are no errors, no failed tests and no alarm. The receiver's redundancy management accepts the first valid frame and drops the duplicate, so a flow that has quietly lost its second path looks exactly like a healthy one. It stays invisible until the surviving switch fails, and then the security monitoring feed it carries goes dark at the worst possible moment.

Why the diff looks correct

Most integration chains generate end system configuration and switch configuration from the same interface control data, but through different tools, at different times, often owned by different teams. A reviewer approving a change to the end system table sees a VL with both networks enabled, the right BAG and the right maximum frame size, and signs it off. The switch tables are a separate artifact built by another script, and a stale filter entry or a port mapping typo on switch B simply drops that VL there. No single file is wrong. The defect exists only in the relationship between files, which is the one thing line-by-line review cannot see. Under airworthiness security standards such as DO-326A this is more than an availability problem, because the security event flow from the gateways to the onboard monitor is usually one of these VLs, and the security case assumes it survives a single network failure.

What the receiver hides

Redundancy management exists to mask exactly one failure, so when the configuration has already used up that failure, the masking turns a dual-path design into a single-path one that still reports itself as dual.

A check you can run before the next load

Start with the static check, because it costs nothing and belongs in CI as a gate, not in review. Export the end system tables and both switch tables in whatever format your toolchain already produces, join them on VL ID, and flag every VL where the set of networks declared at the source differs from the set of switches that actually forward it to each declared destination port. Our estimate is that this comes to well under a hundred lines of script against existing exports. Then run the live check on the integration bench or against a maintenance data download: pull the per-VL receive counters for network A and network B from the end system MIB over the same window and compare them. A healthy redundant VL shows near-equal counts, while a VL that sits at zero on one side as the other climbs is your silent single path. Also read the redundancy management error counters, since frames on a VL with a SkewMax of 500 µs that keep arriving outside that window point to a path that exists but detours through a misconfigured hop, a milder version of the same defect.

Deciding what fails closed

The decision rule is simple: any VL the security case relies on must show proof of a dual path at every configuration load, and if one side's counter stays at zero for a full flight leg, security monitoring counts as degraded and goes into the same dispatch logic as any other lost redundancy. That forces the harder question of what the wireless maintenance gateway does once the monitor loses its feed. Failing closed interrupts gatelink data loads and annoys line maintenance. Failing open leaves an unmonitored entry point on an aircraft that believes it is watched. Most programs that have been through this incident choose fail closed for the maintenance link and accept the operational cost, our estimate being a handful of delayed loads per fleet per year. The next decision is whether the counter divergence becomes a formal maintenance message, which puts it through the same certification change process as any other fault indication. That is slower than a script, but it is the only path that stops this being an incident you rediscover on every new configuration baseline.

Shouldn't the integration test campaign already catch a missing switch entry?

Only if it deliberately fails one switch at a time and checks every VL for delivery, and most functional campaigns run with both networks powered, so redundancy management hides the gap exactly as it does in service.

Back to AvionicsSecurity · Domains

← Back to AvionicsSecurity
Engineering & Architecture Brief

The Virtual Link That Only Lives on Network A

An AFDX virtual link can be declared redundant in the end system and still be missing from one switch's forwarding table. When that happens there are no errors, no failed tests and no alarm. The receiver's redundancy management accepts the first valid frame and drops the duplicate, so a flow that has quietly lost its second path looks exactly like a healthy one. It stays invisible until the surviving switch fails, and then the security monitoring feed it carries goes dark at the worst possible moment.

Why the diff looks correct

Most integration chains generate end system configuration and switch configuration from the same interface control data, but through different tools, at different times, often owned by different teams. A reviewer approving a change to the end system table sees a VL with both networks enabled, the right BAG and the right maximum frame size, and signs it off. The switch tables are a separate artifact built by another script, and a stale filter entry or a port mapping typo on switch B simply drops that VL there. No single file is wrong. The defect exists only in the relationship between files, which is the one thing line-by-line review cannot see. Under airworthiness security standards such as DO-326A this is more than an availability problem, because the security event flow from the gateways to the onboard monitor is usually one of these VLs, and the security case assumes it survives a single network failure.

What the receiver hides

Redundancy management exists to mask exactly one failure, so when the configuration has already used up that failure, the masking turns a dual-path design into a single-path one that still reports itself as dual.

A check you can run before the next load

Start with the static check, because it costs nothing and belongs in CI as a gate, not in review. Export the end system tables and both switch tables in whatever format your toolchain already produces, join them on VL ID, and flag every VL where the set of networks declared at the source differs from the set of switches that actually forward it to each declared destination port. Our estimate is that this comes to well under a hundred lines of script against existing exports. Then run the live check on the integration bench or against a maintenance data download: pull the per-VL receive counters for network A and network B from the end system MIB over the same window and compare them. A healthy redundant VL shows near-equal counts, while a VL that sits at zero on one side as the other climbs is your silent single path. Also read the redundancy management error counters, since frames on a VL with a SkewMax of 500 µs that keep arriving outside that window point to a path that exists but detours through a misconfigured hop, a milder version of the same defect.

Deciding what fails closed

The decision rule is simple: any VL the security case relies on must show proof of a dual path at every configuration load, and if one side's counter stays at zero for a full flight leg, security monitoring counts as degraded and goes into the same dispatch logic as any other lost redundancy. That forces the harder question of what the wireless maintenance gateway does once the monitor loses its feed. Failing closed interrupts gatelink data loads and annoys line maintenance. Failing open leaves an unmonitored entry point on an aircraft that believes it is watched. Most programs that have been through this incident choose fail closed for the maintenance link and accept the operational cost, our estimate being a handful of delayed loads per fleet per year. The next decision is whether the counter divergence becomes a formal maintenance message, which puts it through the same certification change process as any other fault indication. That is slower than a script, but it is the only path that stops this being an incident you rediscover on every new configuration baseline.

Technical FAQ: Shouldn't the integration test campaign already catch a missing switch entry?

Only if it deliberately fails one switch at a time and checks every VL for delivery, and most functional campaigns run with both networks powered, so redundancy management hides the gap exactly as it does in service.

Related Architecture Specifications (AIRSPACEGATEWAY): flexiblesky.com · uavorchestration.com · agenticaav.com

More Technical Articles on avionicssecurity.com

Implementing Zero-Trust Architecture Within Integrated Modular Avionics →Post-Quantum Cryptography for Airborne Over-the-Air Firmware Updates →